| Bingham Junction Development - North | |
Product: Enercon Plus 4-24 Controller
Power for this project wasn’t readily available so the Developers were looking for a solution to the costly power drops and ongoing monthly fees; to power controllers. Draper’s RBI Contractors proposed the commercial grade battery controller concept to the developers - saved thousands - installed 5 units around site, controlling all the common grounds for this multi-use site since 2007.
|
